JTA NEWS
18 November 2017 - 1 Kislev 5778 - א' כסלו ה' אלפים תשע"ח
JTA NEWS :
Haifa welcomes the largest ship ever to dock in Israel E-mail

The 13,092-TEU container ship Maersk Elba arrived at the Carmel Terminal at Haifa Port on 2 February. It was operated on by four STS cranes with an average productivity of 136 containers per ship hour.

The Maersk Elba is part of the weekly service operated by the 2M Alliance of Maersk and MSC. It links the ports of South Korea, China and Singapore to Haifa and continues on to Adriatic ports.

The arrival of the vessel inducted Haifa into the exclusive club of ports capable of handling high-capacity 14,000TEU ships. But the next generation of ships of 18,000 TEU and above will not be able to call in Israel until further development takes place. Five new cranes have been built recently at the Carmel Terminal, in preparation for the facility’s handling of vessels like the Maersk Elba. These were constructed on the dock and join six other STS cranes.

Please login or register to see the full article
 

Warning: Parameter 1 to modMainMenuHelper::buildXML() expected to be a reference, value given in /home/joomla789/domains/jewishtimesasia.org/public_html/libraries/joomla/cache/handler/callback.php on line 99
Jewish Times Asia is published by Jewish Times Asia Ltd. © Copyright 2017.
Material in the newspaper or on this site may not be used or reproduced in any form or in any way without permission from the editor.
While every effort has been made to ensure the content is true and accurate, the publisher is not responsible for any errors or omissions in the printed text.